Pipe Jacking Machine Slurry System by Kosun Manufacturer

Pipe Jacking Machine Slurry System

Pipe Jacking Machine Slurry System used in non-excavation projects . Pipe jacking machine slurry system construction equipment have advantages, can be counted as eight advantages:
(1) pipe jacking machine, the main cylinder, mud water circulation system and mud separation equipment package.
(2) with the eccentric rotary cone crusher of the spoke-type cutter, can be broken outside the top of the pipe 30%, a shaft compression strength of 196MPa (196000KN / ㎡) pebbles and gravel.
(3) pipe jacking to adapt to the formation of a wide range of conditions. Such as clay, gravel and gravel mixed pebbles and soft rock soil. In unstable strata, such as gravel soils, the stability of the ground can be maintained by maintaining the soil pressure of the tapered eccentric crusher.

Pipe Jacking Machine Slurry System Pipe Jacking Machine Slurry System
Pipe Jacking Machine Slurry System

(4) the use of the main cylinder installed in the track, a jacking can be more than 100m in length.
(5) pipe jacking machine from the ground can be a remote operation.
(6) on the console will be able to complete the TV monitoring and direction control. To maintain high accuracy.
(7) the use of the main cylinder can be a top end of a pipeline without interruption.
(8) The mud separation unit is a flexible, sealed separation system that saves installation space.

Kosun to carry out scientific and technological innovation, improve the pipe jacking mud management system separation  to solve the separation of ultra-fine particles of soil problems. Through the separation of mud, the water can be reused after treatment to ensure zero emissions, zero leakage, zero pollution, and effectively green construction. “This section of the chief engineer Xu Weiging introduced.

“To separate the mud, as if to sesame paste in the sesame seeds and water separated.” 13 section of the party secretary of the party secretary Lan Hongbin said that large particles can be separated with sieve, and the remaining “sesame paste” In the “sesame” to be separated, it becomes a problem.

After years of exploration and experimentation, Kosun summed up a set of sieves, swirling, pressure filtration, centrifugation and auxiliary agents of the method, the successful realization of the mud shield solid-liquid separation, separation of the dregs transported to a special storage Transport places, the water is recycled.

 

Pipe Jacking Machines Mud Treatment by Kosun Manufacturer

Pipe Jacking Machines Mud Treatment

Pipe Jacking Machines Mud Treatment by Kosun manufacturer with more than 20 years experience. The selection of the pipe jacking method should be selected according to the actual situation of the terrain, engineering and hydrogeology, traffic conditions, ground buildings, underground pipelines and the presence of underground obstructions along the construction and the requirements for surface deformation control , Must ensure that the safety, to ensure quality, affordable, land conservation, pipe jacking machine construction mud treatment.

Pipe Jacking Machines Mud Treatment
Pipe Jacking Machines Mud Treatment

The construction sequence of the pipe jacking should be considered from the whole drainage system. The pipe treatment of the pipe jacking machine should start from the downstream, and the construction condition should be better when the initial excavation section is carried out.

Pipe jacking machine slurry system work characteristics:

1,pipe jacking machine, crushing treatment integration, without any auxiliary technology.
2, the machine bypass device standardization, greatly reducing the installation time and prevent mud pipe obstruction.
3, laser reflection type direction induction device can make the operation simple and accurate.
4, for a wide range of soil, pipe a long distance.
5, the water quality requirements are low, mud water after the separation of mud can be recycled.
6, water mixing soil through the pipeline into the purification pool, the entire pipeline to keep dry, easy to check the construction.
7, pipe head using mechanical excavation, effective to prevent landslides, gushing water, sand and harmful gases.

The technical risk is less and the top and the necessary field technical data testing and analysis work in order to understand the actual soil under the ground to adapt to the construction environment, to master the operation of the pipe jacking equipment, reasonable organization of the operator, through the initial excavation section of the jacking summary, further Adjust the construction of technical parameters, optimize the next step pipe construction process.

All the pipe jacking equipment must be repaired, pipe jacking machine mud treatment after passing the inspection before being transported into the construction site. In the work of the pit must be installed when the single machine and the whole linkage debugging, in the jacking must implement a routine maintenance system.