Pipe Jacking Machine Mud Management System

Pipe Jacking Machine Mud Management System

Pipe Jacking Machine Mud Management System method should be selected according to the actual situation of the terrain, engineering and hydrogeology, traffic conditions, ground buildings, underground pipelines and the presence of underground obstructions along the construction and the requirements for surface deformation control , Must ensure that the safety, to ensure quality, affordable, land conservation, pipe jacking machine construction mud treatment.

The mud treatment equipment is a mud purification treatment machine developed for the construction mud, the bridge pile foundation project, the underground tunnel shield engineering and the non-excavation construction.

pipe jacking machine mud management system
pipe jacking machine mud management system


It can effectively control the slurry quality of the construction mud, solid-liquid separation of the solid particles in the mud, improve the pile formation rate, reduce the amount of bentonite to reduce the cost of pulp. Can realize the environmental transportation and slurry discharge of the sludge residue, and meet the on-site requirements of the environmental protection construction.

The construction sequence of the pipe jacking should be considered from the whole drainage system. The pipe treatment of the pipe jacking machine should start from the downstream, and the construction condition should be better when the initial excavation section is carried out.

The technical risk is less and the top And the necessary field technical data testing and analysis work in order to understand the actual soil under the ground to adapt to the construction environment, to master the operation of the pipe jacking equipment, reasonable organization of the operator, through the initial excavation section of the jacking summary, further Adjust the construction of technical parameters, optimize the next step pipe construction process.

All the pipe jacking equipment must be repaired, pipe jacking machine mud treatment after passing the inspection before being transported into the construction site. In the work of the pit must be installed when the single machine and the whole linkage debugging, in the jacking must implement a routine maintenance system.